Product Analysis & DFM
We review shrinkage, draft, parting line, wall thickness, ribs, bosses and gate location before steel is cut.
A practical buyer guide to how Moldinno reviews plastic parts, selects tool steel, machines cavities, assembles mold structures and validates T0/T1 samples before production.

A mold is not only a steel block. It is a sequence of engineering decisions. The earliest decisions—shrinkage, parting line, draft angle, wall thickness, gate position and tool steel—directly affect later machining, fitting, sample quality and production stability.
We review shrinkage, draft, parting line, wall thickness, ribs, bosses and gate location before steel is cut.
Tool steel is selected according to resin, expected volume, corrosion risk, polishing requirement and mold life target.
CNC forms the cavity and core geometry. EDM supports narrow slots and deep features. WEDM is used for pins, inserts and precision cut-outs.
Slides, lifters, ejection, parting surfaces, guide systems and inserts are fitted to support stable mold action.
Water channels and ejection balance are checked because they affect cycle time, warpage, sticking and part deformation.
Trial samples are reviewed for flash, sink, warpage, dimension, appearance and functional fit before production release.
Real workshop video helps buyers see the machining environment and understand how mold components are prepared before trial samples.

Complex mold components often require multiple machining methods and careful process control.
Send drawings, resin target, annual quantity and appearance requirements. We will review the manufacturing path before giving a practical quote.
After DFM questions, cavity direction, gate, cooling, ejection, steel and component assumptions are sufficiently clear.
CNC, EDM, wire cutting, grinding and fitting serve different geometries, surface and accuracy requirements.
Basic filling, mold action, flash, sink, warp, dimensions and major appearance or assembly issues are reviewed.
After agreed sample issues are closed, acceptance criteria are met and the process and quality plan are confirmed.